Baulon Town Hall
The client’s objectives and expectations
- Reduce energy costs for heating municipal buildings,
- Reduce the overall environmental impact of the municipal assets,
- Use renewable energy.
Our main tasks
- Design a high-performance installation with quality equipment and ease of operation,
- Advise the project owner on equipment choices and integrate the project into its environment,
- Provide technical and administrative support to the project owner for overall project management,
- Ensure coordination with the various stakeholders during the design phase and throughout construction,
- Support the project owner in preparing subsidy application files.

Project characteristics
- Wood power – Boiler 1: 120 kW,
- Wood power – Boiler 2: 80 kW,
- District heating network: 220 meters,
- Connected buildings: Schools, media library, multipurpose hall, school cafeteria.
Consortium
- Fluid engineering (lead): Exoceth,
- Architects: Gumiaux & Gombeau.
Working on this innovative project has been a true privilege. Since its commissioning, the pellet wood-fired installation has fully satisfied the project owner. The cascade of the two wood boilers allows optimal power modulation to meet the needs of the connected buildings throughout the heating season. The boiler room, operated autonomously by the municipality’s technical service, supplies two renewable energy networks. This is a first in France.
Guillaume, Deputy Director Exoceth